|
The Buildings
home | the buildings | cell 3 (630) | further pictures...
And finally we reach Cell 3 West where the main pipe
moves upwards again and connects to the back of this cell. Looking back, we realise that we’ve
travelled underground from the back of the main Cell building, across the loading bay outside,
under the covered section and through a final piece of tunnel to emerge in a concrete trench by
the first concrete wall pictured.
|
View west across the suction mains back to the covered section and Cell 3. 05|05|07 © Simon Cornwell 2007
|
|